Monday, November 21, 2011

Day 323 - Unwound

The mittens continue to be my challenge and fill in piece.  I did discover last night that Google Translator does a pretty good job translating Finnish (the pattern) into something resembling a coherent pattern in English.  I translated enough to get me all the way thru the gusset and shaping of the first mitten.  Right now I'm abut 2/3 thru the thumb gusset.  I'm still a bit worried that these will fit my fat hands. 

I knit myself into a stupor this evening.  Who says knitting isn't relaxing?  May be too much so tonight.  I did get my 11.

Sunday, November 20, 2011

Day 322 - Why I'm Unhappy

 This was my newest planting area as I was building it late summer 2010.
 This is what the oaks looked like that fall. 
This is the scarlet oak on the left in the photos above.  Yes it does live up to it's name.  Beautiful isn't it.  This was shot in 2009.
This is what I saw when I walked out the door Saturday morning.
That hole is less than 2' feet from the trunk. 

 The yellow pipe is the new gas service.
 The shattered pipe is the storm drain from my gutters.  Notice that the other part of the roots are over there. 

These were basically half the roots on the tree that help keep it from falling over in heavy winds, storms or snow.  They also feed it.  And now they are gone.  The tree is about 25 - 35' high at this time.  That's a lot of tree to support.
 So when they got finished they decided that the best way to backfill was to use the back hoe.
 Never mind that it kept getting tangled in the limbs.
 Or that it had been surrounded with a planting bed full of perennials and bulbs.  Nope they didn't move them.  They are somewhere in the hole and there are chunks of sod in the planting area.

And they weren't happy that I was taking pictures and actually yelled that there were to be no pictures taken.
 And the area is now covered in rocks.  All that topsoil I put down the hard way last fall. Gone...
And my storm line...shattered, full of crud and tipped the up instead of down. That isn't going to drain.

They basically did the same thing along the back fence.  My shrubs and perennials are gone and the planting bed is full of sod.  Actually it is now higher than the bed inside the fence.



Day 321 - Not Good

Spent most of the day watching and waiting on the gas company to finish the installation of the new service line and meter and connecting everything to the existing gas lines in the basement.  They have done their best to destroy any planting area they were near. I'm truly concerned that they have killed my oak tree. Photos tomorrow.

My 11 were spent teaching Barb how to use Ravelry.

Friday, November 18, 2011

Day 320 - Friday at last

I was at work before 7am and didn't leave until after 8.  But I did manage to get lunch today.  So it was better.  I accomplished a lot, so it was good.  Don't know what management is going to say when they see the OT or the screwy punchs around my lunch break.  It took a bit of maneuvering to make sure I managed at least 31 minutes off for lunch. (They have rules about no working off the clock.  Which is OK but can be awkward at times.  Especially when you're used to being salaried and doing whatever it takes to solve a problem/provide customer service.)  My supervisor has said he'll back me but we both know they won't be happy.  End result very little fiber time today.  Two rounds on the mitten.

Finally managed to reach the gas company this afternoon.  I explained about the notes, and strongly expressed my unhappiness with how they have drawn out this whole mess, and their less than stellar ability to communicate.  I also asked what they were planning to use to run the new service through the basement (unknown).  I pointed out that the house had black iron for the existing service and I expected any new work to match.  I was blunt to the point of stating, "I don't spec or allow that plastic crap in the homes I design, and I damn sure don't want it in mine."  Tomorrow may be interesting.  There were more ultimatums in the doors tonight.  Looks like they are trying to make it as painful as possible.  There is a new huge hole in the lawn and multiple piles of dirt again.  I have very little faith in them at this point. 

Maybe I should limit myself to the machine tomorrow.  Harder to screw up the tension there.


Thursday, November 17, 2011

Day 319

Not a big fiber day.  Long day at work, and then a Scentsy party at Robin's.  Lindsey has decided to become a Scentsy sales consultant.  Interesting idea and scents.  Something new for this area. 

Found this at Joann's this evening.  Made me think of Heather.  You go girl.


Wednesday, November 16, 2011

Day 318 - arrghhhhhhhhhh

Ever have one of those times where you'd like to reach out and punch someone?  The day was going well until I came home from work, entering as usual via the kitchen/back door.  I walked through the house and went out the front door to get the mail from the box on the porch and discovered a note with what I have to interpret as a threat on it.  It was from the contractor doing the gas line installations for Columbia and stated "Final Notice - Must call for an appointment this Saturday or gas service will be shut off".  When I was bringing the groceries in I found another one in the side door.

They've been screwing around with this for months.  Pretty much everything they've told me has been a lie.  Two weeks ago I came home late on Friday evening to find one on the side door, "Please call to confirm a 11/5/11 appointment to move meter outside. 419-xxx-xxxx Paul Thank you for your time"  Only problem was it was late, and no one had contacted me to make an appointment.  They had both my house and cell numbers, its not like you can't call.  Turned out that when the guy finally showed up after 10am, there was enough time, as I had to meet my mom and sister to celebrate my sister's birthday.  The guy said they would be back the following Saturday.

Flash forward a week, I hustled to get the laundry done so I didn't need the water heater, and hung around until after 2 pm.  No one called, no one showed.  Didn't hear anything until tonight's threat.  Understand that I have repeatedly told them if they have to leave notes for me to find to use the back door.  Here's the number for my leash cell, you can pretty much always reach me. It's not like it's impossible.

They're about to discover that I don't respond that well to threats.  I have the number of the project manager on Columbia's payroll.  I'm pissed.


Tuesday, November 15, 2011

Day 317 - Growing

I've made it past the garter stitch beard and have started the shaping of the leg and returned to simple intarsia, I'm well past the halfway point and picking up speed.  It is probably about 8 inches long at this point. Maybe it will be off the needles tonight and the next one will be ready to cast on tomorrow.  I've been working on it for about an hour tonight, and will likely spend another 90 or so before calling it a night.  So I've more than made my 11.